Hamilton Substation


This new 11/33 KV substation, located directly opposite Newcastle Race Course, was constructed due to the existing Sub Station being decommissioned.  Newcastle is continually developing new zones for power distribution to handle the ever increasing requirements for the CBD and regional surrounds.

Product Featured: Wunpeece Conduit Spacers


Project:                  Hamilton Substation Newcastle

Contractor:            Energy Australia

The Wunpeece Conduit Spacers were utilised to keep spacing constant for Electrical pipe along a duct bank installed under a roadway for approx 500 metres.  Used in conjunction with our Heavy Duty Plinths (to stop Pipe Flotation) the concrete back pour was a success.  With the demand on the increase to keep electrical and communication pipe spaced at specified requirements the Wunpeece Conduit Spacers were the perfect solution for this underground application.